Delivering the Nuclear Promise

EB 16-28a: Minimize NUPIC Vendor Audit Frequency

This efficiency bulletin will utilize the regulatory allowance to audit suppliers at a frequency of 36 months.

Delivering the Nuclear Promise

EB 16-34: Streamline Program Health Reporting

This efficiency bulletin will streamline reporting on the health of nuclear power plant engineering programs by reducing the number of formal reports that must be prepared.

Delivering the Nuclear Promise

EB 16-33: System Health Reporting

This efficiency bulletin will reduce administrative burden by eliminating low-value reports on the health of engineering systems.

This efficiency bulletin will improve the efficiency of visitor in-processing by reducing administrative burdens and costs associated with thermoluminescent dosimeter and optically stimulated luminescent dosimeter issuance.

This efficiency bulletin will optimize assessment activities performed by executive leadership above the site vice president level.

Delivering the Nuclear Promise

EB 16-27b: Optimized Corporate Oversight and Assessment

This efficiency bulletin will optimize oversight and assessment activities performed by corporate organizations, fleets and individual stations to eliminate redundancies.

Delivering the Nuclear Promise

EB 16-27a: Consolidation of Oversight Meetings

This efficiency bulletin will consolidate various meetings related to site oversight to optimize the use of management time and to reduce administrative burdens associated with meeting preparation.

Reports & Briefs

Nuclear Power in America and the World

NEI's memo for the Trump transition team outlines several key policies needed in the immediate future and in the longer term to ensure the benefits of nuclear power.

This efficiency bulletin will reduce redundant and unnecessary training that personnel currently complete to obtain and maintain a badge granting access to nuclear power plants.

Delivering the Nuclear Promise

EB 16-18: NLO/Maintenance and Technical Initial Training Content

This efficiency bulletin will significantly reduce the time spent on training courses for non-licensed operators and other personnel while maintaining existing standards of excellence.

Delivering the Nuclear Promise

EB 16-31: Pre-Approval Criteria for Work Execution

This efficiency bulletin will allow work that has limited impact on the control room or the plant to be conducted without obtaining pre-approval from the control room/work execution center

Delivering the Nuclear Promise

EB 16-30: Material Cost Reduction While Maintaining Quality

This efficiency bulletin will create a centralized procurement engineering services organization that will reduce duplicative work and standardize procurement policies and procedures