Reactor Name Type MWt Location Operating License Issued Shutdown Status
Big Rock Point BWR 240 Charlevoix, MI 5/1/1964 8/29/1997 DECON Completed
Bonus* BWR 50 Punta Higuera, PR 4/2/1964 6/1/1968 ENTOMB
Crystal River 3 PWR 2,609 Crystal River, FL 12/3/1976 2/20/2013 SAFSTOR
CVTR*** PTHW 65 Parr, SC 11/27/1962 1/1/1967 DECON Completed
Dresden 1 BWR 700 Morris, IL 9/28/1959 10/31/1978 SAFSTOR
Elk River* BWR 58 Elk River, MN 11/6/1962 2/1/1968 DECON Completed
Fermi 1 SCF 200 Newport, MI 5/10/1963 9/22/1972 SAFSTOR
Fort Calhoun PWR 1,500 Ft. Calhoun, NE 8/9/1973 10/24/2016 SAFSTOR
Fort St. Vrain HTG 842 Platteville, CO 12/21/1973 8/18/1989 DECON Completed
GE VBWR BWR 50 Pleasanton, CA 8/31/1957 12/9/1963 SAFSTOR
Haddam Neck PWR 1,825 Meriden, CT 12/27/1974 12/5/1996 DECON Completed
Hallam* SCGM 256 Hallam, NE 1/2/1962 9/1/1964 ENTOMB
Humboldt Bay 3 BWR 200 Eureka, CA 8/28/1962 7/2/1976 DECON in Progress
Indian Point 1 PWR 615 Buchanan, NY 3/26/1962 10/31/1974 SAFSTOR
Kewaunee PWR 1,772 Kewaunee, WI 12/21/1973 5/7/2013 SAFSTOR
LaCrosse BWR 165 Genoa, WI 7/3/1967 4/30/1987 DECON
Maine Yankee PWR 2,700 Wiscasset, ME 6/29/1973 12/6/1996 DECON Completed
Millstone 1 BWR 2,011 Waterford, CT 10/31/1986 7/21/1998 SAFSTOR
NS Savannah PWR 74 Baltimore, MD 8/1/1965 11/1/1970 SAFSTOR
Oyster Creek BWR 1,930 Forked River, NJ 7/2/1991 9/17/2018 SAFSTOR
Pathfinder BWR 190 Sioux Falls, SD 3/12/1964 9/16/1967 DECON Completed
Peach Bottom 1 HTG 115 Peach Bottom, PA 1/24/1966 10/31/1974 SAFSTOR
Piqua* OCM 46 Piqua, OH 8/23/1962 1/1/1966 ENTOMB
Rancho Seco PWR 2,772 Herald, CA 8/16/1974 6/7/1989 DECON Completed
San Onofre 1 PWR 1,347 San Clemente, CA 3/27/1967 11/30/1992 SAFSTOR
San Onofre 2 PWR 3,438 San Clemente, CA 2/16/1982 6/7/2013 DECON in Progress
San Onofre 3 PWR 3,438 San Clemente, CA 11/15/1982 6/7/2013 DECON in Progress
Saxton PWR 24 Saxton, PA 11/15/1961 5/1/1972 DECON Completed
Shippingport PWR 236 Shippingport, PA NA 1/1/1982 DECON Completed
Shoreham BWR 2,436 Wading River, NY 4/21/1989 6/28/1989 DECON Completed
Three Mile Island 2 PWR 2,770 Middletown, PA 2/8/1978 3/28/1979 SAFSTOR
Trojan PWR 3,411 Ranier, OR 11/21/1975 11/9/1992 DECON Completed
Vermont Yankee BWR 1,912 Vernon, VT 3/21/1972 12/29/2014 SAFSTOR
Yankee Rowe PWR 600 Franklin Co., MA 12/24/1963 10/1/1991 DECON Completed
Zion 1 PWR 3,250 Zion, IL 10/19/1973 2/21/1997 DECON in Progress
Zion 2 PWR 3,250 Zion, IL 11/14/1973 9/19/1996 DECON in Progress
* AEC/DOE owned; not regulated by NRC.                
**Post-defueling monitored storage (PDMS).                
*** Holds byproduct license from State of South Carolina                
DECON - soon after the nuclear facility closes, equipment, structures, and portions of the facility containing  radioactive contaminants    
are removed or decontaminated to a level that permits release of the property and termination of the NRC license.         
SAFSTOR - often considered "delayed DECON," a nuclear facility is maintained and monitored in a condition that allows     
the radioactivity to decay; afterwards, it is dismantled.                 
ENTOMB - radioactive contaminants are encased in a structurally long-lived material, such as concrete. The entombment structure is appropriately
maintained, and continued surveillance is carried out until the radioactivity decays to a level permitting unrestricted release of the property.    
Source: Nuclear Regulatory Commission                    